FRANKFURT – German utility E.ON on Monday stated it is able to cope with a authorities request to maintain its Isar 2 nuclear plant in reserve mode, past the scheduled closure on the finish of 2022.
“With the plan now offered, a very powerful query shall be to look at whether or not and the way it's technically and organisationally possible, as a result of nuclear energy crops of their technical design are usually not reserve energy crops that may be variably switched on and off,” it stated.
E.ON had stated previous to the request it was theoretically and technically capable of preserve the plant intact, however the ball relating to situations was within the authorities’s courtroom.
Post a Comment